ITAC Assessment: KG0079
ITAC logo
ITAC Assessment: KG0079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Magnetic Circuit Breakers
NAICS
n/a
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 50,000
ft2
Annual Production 35,000,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,473 1,366,061
kWh
Electricity Demand $11,417 4,334
kW-mo/yr
Electricity Fees $60 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $170,290 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.7261: Install timers and/or thermostats $12,301 $1,050 n/a $12,301
251,465
kWh
- - -
02 2.7251: Reduce air conditioning load by evaporating water from roof $4,649 $500 n/a $4,649
94,959
kWh
- - -
03 2.4133: Use most efficient type of electric motors $1,624 $4,980 n/a $1,431
29,308
kWh
$193
-
kW-mo/yr
- -
04 3.2176: Increase use of automation $114,608 $200,000 n/a - - $114,608
-
lb
-
05 3.5315: Lease / purchase baler; sell cardboard to recycler $708 - n/a - - $708
-
lb
-
06 4.442: Install magazines for temporary storage $36,400 $24,750 n/a - - - $36,400
TOTAL RECOMMENDED $170,290 $231,280 $18,381
375,732
kWh
$193
-
kW-mo/yr
$115,316
-
lb
$36,400
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs