| Assessment Year | 1989 |
|---|---|
| Principal Product | POLYSTYRENE PACKAGING |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 35 |
| Plant Area |
n/a
|
| Annual Production | 10,000,000
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $102,353 | 2,397,128 |
kWh
|
$0.043 |
| Natural Gas | $153,331 | 45,315 |
MMBtu
|
$3.38 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $31,184 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $31,184 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $200 | $89 |
$200
5,862
kWh
|
- | |
| 02 | 2.2122: Install / repair insulation on condensate lines | $123 | $240 | - |
$123
-
MMBtu
|
|
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,427 | $1,500 | - |
$1,427
-
MMBtu
|
|
| 04 | 2.2135: Repair and eliminate steam leaks | $26,441 | $5,000 | - |
$26,441
-
MMBtu
|
|
| 05 | 2.4133: Use most efficient type of electric motors | $190 | $448 |
$190
5,569
kWh
|
- | |
| 06 | 2.2444: Use hot process fluids to preheat incoming process fluids | $2,803 | $3,680 | - |
$2,803
-
MMBtu
|
|
| TOTAL RECOMMENDED | $31,184 | $10,957 |
$390
11,431
kWh
|
$30,794
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $31,184 | $10,957 |
$390
11,431
kWh
|
$30,794
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs