ITAC Assessment: OK0281
ITAC logo
ITAC Assessment: OK0281
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product POLYSTYRENE PACKAGING
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area
n/a
Annual Production 10,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,353 2,397,128
kWh
Natural Gas $153,331 45,315
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,184 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,184

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $200 $89 $200
5,862
kWh
-
02 2.2122: Install / repair insulation on condensate lines $123 $240 - $123
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,427 $1,500 - $1,427
-
MMBtu
04 2.2135: Repair and eliminate steam leaks $26,441 $5,000 - $26,441
-
MMBtu
05 2.4133: Use most efficient type of electric motors $190 $448 $190
5,569
kWh
-
06 2.2444: Use hot process fluids to preheat incoming process fluids $2,803 $3,680 - $2,803
-
MMBtu
TOTAL RECOMMENDED $31,184 $10,957 $390
11,431
kWh
$30,794
-
MMBtu
TOTAL IMPLEMENTED $31,184 $10,957 $390
11,431
kWh
$30,794
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs