ITAC Assessment: NC0469
ITAC logo
ITAC Assessment: NC0469
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Upholstered furniture
NAICS 337121: Upholstered Household Furniture Manufacturing
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area 454,422
ft2
Annual Production 36,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,042 1,756,770
kWh
Electricity Demand $34,708 8,817
kW-mo/yr
Natural Gas $6,778 819
MMBtu
Wood $1 4,500
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,848 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,634

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $22,713 $129,851 $16,349
258,684
kWh
$6,364
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $389 $1,595 $187
2,958
kWh
$73
-
kW-mo/yr
$129
03 2.7135: Install occupancy sensors $769 $1,200 $769
12,169
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $784 $843 $320
5,070
kWh
$29
-
kW-mo/yr
$435
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $934 $200 $680
10,760
kWh
$254
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,526 - $1,098
17,380
kWh
$428
-
kW-mo/yr
-
07 2.5194: Redesign process $12,445 $25,000 $8,958
141,740
kWh
$3,487
-
kW-mo/yr
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $288 $860 $207
3,280
kWh
$81
-
kW-mo/yr
-
TOTAL RECOMMENDED $39,848 $159,549 $28,568
452,041
kWh
$10,716
-
kW-mo/yr
$564
TOTAL IMPLEMENTED $26,634 $133,349 $18,841
298,132
kWh
$7,229
-
kW-mo/yr
$564
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs