Assessment Year | 2014 |
---|---|
Principal Product | steel parts |
NAICS | 332322: Sheet Metal Work Manufacturing |
SIC | 3444: Sheet Metal Work |
Sales Range | $50 M to 100M |
# of Employees | 210 |
Plant Area |
147,000
ft2
|
Annual Production | 25,000
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $98,041 | 1,380,482 |
kWh
|
$0.071 |
Natural Gas | $17,569 | 2,410 |
MMBtu
|
$7.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $136,692 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,447 | - |
$3,447
48,547
kWh
|
- | - | |
02 | 3.5316: Contract a wood pallet recycling company | $8,857 | - | - | - |
$8,857
-
lb
|
|
03 | 2.7135: Install occupancy sensors | $4,976 | $3,995 |
$4,976
70,085
kWh
|
- | - | |
04 | 2.6232: Install set-back timers | $2,707 | $236 |
$736
10,371
kWh
|
$1,971
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,818 | $175 |
$3,818
53,784
kWh
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $2,988 | $280 |
$2,988
42,083
kWh
|
- | - | |
07 | 2.4322: Use or replace with energy efficient substitutes | $5,453 | $671 |
$5,453
76,808
kWh
|
- | - | |
08 | 3.5217: Reuse / recycle/ sell paper products | $72,576 | $12,435 | - | - |
$72,576
-
lb
|
|
09 | 2.7261: Install timers and/or thermostats | $3,685 | $3,528 | - |
$3,685
-
MMBtu
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $28,185 | $85,493 |
$28,185
396,970
kWh
|
- | - | |
TOTAL RECOMMENDED | $136,692 | $106,813 |
$49,603
698,648
kWh
|
$5,656
-
MMBtu
|
$81,433
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs