Assessment Year | 2009 |
---|---|
Principal Product | Toaster Pastries and Baked Goods |
NAICS | 311821: Cookie and Cracker Manufacturing |
SIC | 2052: Cookies and Crackers |
Sales Range | $5 M to 10M |
# of Employees | 300 |
Plant Area |
311,300
ft2
|
Annual Production | 86,950,000
lb
|
Production Hrs. Annual | 6,808
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $829,890 | 10,920,301 |
kWh
|
$0.076 |
Electricity Demand | $118,152 | 21,993 |
kW-mo/yr
|
$5.37 |
Natural Gas | $912,152 | 193,754 |
MMBtu
|
$4.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $54,484 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $42,693 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7131: Add area lighting switches | $10,860 | $8,096 |
$9,898
130,237
kWh
|
$962
-
kW-mo/yr
|
- | |
02 | 2.7135: Install occupancy sensors | $4,252 | $4,247 |
$3,786
49,820
kWh
|
$466
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,116 | $1,649 |
$906
11,908
kWh
|
$210
-
kW-mo/yr
|
- | |
04 | 2.7122: Disconnect ballasts | $2,089 | $2,200 |
$1,858
24,444
kWh
|
$231
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,483 | $29,250 |
$12,808
168,519
kWh
|
$1,675
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,309 | $5,917 |
$1,191
16,320
kWh
|
$118
-
kW-mo/yr
|
- | |
07 | 2.4151: Develop a repair/replace policy | $4,792 | $15,044 |
$4,261
56,054
kWh
|
$531
-
kW-mo/yr
|
- | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,513 | $1,610 |
$3,513
44,694
kWh
|
- | - | |
09 | 2.4226: Use / purchase optimum sized compressor | $8,278 | $7,995 |
$8,278
108,928
kWh
|
- | - | |
10 | 2.6211: Conserve energy by efficient use of vending machines | $934 | - |
$547
7,200
kWh
|
$387
-
kW-mo/yr
|
- | |
11 | 2.2136: Install / repair insulation on steam lines | $1,559 | $2,887 | - | - |
$1,559
-
MMBtu
|
|
12 | 2.7261: Install timers and/or thermostats | $1,299 | - | - | - |
$1,299
-
MMBtu
|
|
TOTAL RECOMMENDED | $54,484 | $78,895 |
$47,046
618,124
kWh
|
$4,580
-
kW-mo/yr
|
$2,858
-
MMBtu
|
||
TOTAL IMPLEMENTED | $42,693 | $69,290 |
$35,255
464,502
kWh
|
$4,580
-
kW-mo/yr
|
$2,858
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs