ITAC Assessment: IA0034
ITAC logo
ITAC Assessment: IA0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PREFABRICATED METAL BUILDINGS
NAICS
n/a
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 106
Plant Area
n/a
Annual Production 21,786
ton
Production Hrs. Annual 3,640
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $159,389 2,717,468
kWh
Natural Gas $53,067 12,641
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,008 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,568

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $4,906 $17,000 $(-292.0)
(-4,982)
kWh
$5,198
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,216 $240 $4,216
71,805
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $1,355 $200 $1,355
23,154
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $585 $83 $695
11,723
kWh
- $(-110.0)
05 2.6232: Install set-back timers $594 $1,170 $594
10,258
kWh
- -
06 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $352 $100 $352
6,155
kWh
- -
TOTAL RECOMMENDED $12,008 $18,793 $6,920
118,113
kWh
$5,198
-
MMBtu
$(-110.0)
TOTAL IMPLEMENTED $4,568 $340 $4,568
77,960
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs