Assessment Year | 1992 |
---|---|
Principal Product | PREFABRICATED METAL BUILDINGS |
NAICS |
n/a
|
SIC | 3448: Prefabricated Metal Buildings and Components |
Sales Range | $10 M to 50M |
# of Employees | 106 |
Plant Area |
n/a
|
Annual Production | 21,786
ton
|
Production Hrs. Annual | 3,640
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $159,389 | 2,717,468 |
kWh
|
$0.059 |
Natural Gas | $53,067 | 12,641 |
MMBtu
|
$4.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,008 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,568 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,906 | $17,000 |
$(-292.0)
(-4,982)
kWh
|
$5,198
-
MMBtu
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,216 | $240 |
$4,216
71,805
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,355 | $200 |
$1,355
23,154
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $585 | $83 |
$695
11,723
kWh
|
- | $(-110.0) | |
05 | 2.6232: Install set-back timers | $594 | $1,170 |
$594
10,258
kWh
|
- | - | |
06 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $352 | $100 |
$352
6,155
kWh
|
- | - | |
TOTAL RECOMMENDED | $12,008 | $18,793 |
$6,920
118,113
kWh
|
$5,198
-
MMBtu
|
$(-110.0) | ||
TOTAL IMPLEMENTED | $4,568 | $340 |
$4,568
77,960
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs