ITAC Assessment: IA0008
ITAC logo
ITAC Assessment: IA0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ANIMAL VACCINES
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 360,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $263,628 6,230,950
kWh
Natural Gas $83,667 31,059
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,211 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $9,470 $8,500 $6,050
143,025
kWh
$3,420
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,457 - $5,010
118,406
kWh
- $(-553.0)
03 2.6232: Install set-back timers $4,754 $6,000 $4,754
112,251
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $293 $50 $293
7,034
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $237 $50 $237
5,569
kWh
- -
TOTAL RECOMMENDED $19,211 $14,600 $16,344
386,285
kWh
$3,420
-
MMBtu
$(-553.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs