| Assessment Year | 2024 |
|---|---|
| Principal Product | Forged Steel Components |
| NAICS | 332111: Iron and Steel Forging |
| SIC | 3462: Iron and Steel Forgings |
| Sales Range | $10 M to 50M |
| # of Employees | 104 |
| Plant Area |
155,000
ft2
|
| Annual Production | 5,000
ton
|
| Production Hrs. Annual | 3,800
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $166,033 | 2,384,461 |
kWh
|
$0.070 | |
| Electricity Demand | $151,450 | 9,668 |
kW-mo/yr
|
$15.67 | |
| Electricity Fees | $38,391 | - |
|
- | |
| Natural Gas | $1,199,541 | 212,851 |
MMBtu
|
$5.64 | |
| Waste Disposal Costs | |||||
| Water Usage | $101,328 | 14,711 |
Tgal
|
$6.89 | |
| TOTAL YEARLY COSTS | $1,656,743 | ||||
| RECOMMENDED SAVINGS* | $161,070 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $4,410 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $155,302 | $120,000 | - | - |
$155,302
-
MMBtu
|
|
| 02 | 2.4239: Eliminate or reduce compressed air usage | $2,743 | $4,500 |
$1,474
21,060
kWh
|
$1,269
-
kW-mo/yr
|
- | |
| 03 | 2.7224: Reduce space conditioning during non-working hours | $1,667 | $900 |
$534
7,623
kWh
|
$178
-
kW-mo/yr
|
$956
-
MMBtu
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,358 | $2,488 |
$721
10,296
kWh
|
$637
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $161,070 | $127,888 |
$2,728
38,979
kWh
|
$2,083
-
kW-mo/yr
|
$156,258
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $4,410 | $5,400 |
$2,008
28,683
kWh
|
$1,447
-
kW-mo/yr
|
$956
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs