ITAC Assessment: UD0345
ITAC logo
ITAC Assessment: UD0345
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product NON-METALLIC GASKETS
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 100,000,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $44,109 694,607
kWh
Natural Gas $15,117 3,490
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,030 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $6,172 $20,000 $6,989
98,183
kWh
$(-817.0)
-
MMBtu
02 2.7221: Lower temperature during the winter season and vice-versa $354 $800 $354
4,396
kWh
-
03 2.7221: Lower temperature during the winter season and vice-versa $964 - $964
11,430
kWh
-
04 2.7261: Install timers and/or thermostats $1,540 $720 - $1,540
-
MMBtu
TOTAL RECOMMENDED $9,030 $21,520 $8,307
114,009
kWh
$723
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs