Assessment Year | 1983 |
---|---|
Principal Product | CHROME PLATED PLASTIC |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $1 M to 5M |
# of Employees | 112 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,700
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $68,998 | 1,348,183 |
kWh
|
$0.051 |
Natural Gas | $27,161 | 5,906 |
MMBtu
|
$4.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,723 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $820 | $206 |
$1,024
21,102
kWh
|
$(-204.0)
-
MMBtu
|
- | |
02 | 2.6121: Reduce hot water temperature to the minimum required | $170 | - |
$170
3,224
kWh
|
- | - | |
03 | 2.2511: Insulate bare equipment | $922 | $1,200 |
$1,176
24,912
kWh
|
$(-254.0)
-
MMBtu
|
- | |
04 | 2.2444: Use hot process fluids to preheat incoming process fluids | $4,811 | - |
$(-221.0)
(-4,396)
kWh
|
$2,206
-
MMBtu
|
$2,826 | |
TOTAL RECOMMENDED | $6,723 | $1,406 |
$2,149
44,842
kWh
|
$1,748
-
MMBtu
|
$2,826 | ||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs