ITAC Assessment: GT0959
ITAC logo
ITAC Assessment: GT0959
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Polyethylene Film and Bags
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area 40,000
ft2
Annual Production 90,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $593,396 8,055,852
kWh
TOTAL YEARLY COSTS $593,396
RECOMMENDED SAVINGS* $59,289 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,490

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $11,495 $800 - $11,495 -
02 2.7261: Install timers and/or thermostats $184 $50 $184
2,486
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,641 $1,850 $6,541
88,390
kWh
- $(-2,900.0)
04 2.6231: Utilize controls to operate equipment only when needed $170 $315 $170
2,298
kWh
- -
05 2.4226: Use / purchase optimum sized compressor $6,169 $23,000 $6,169
83,366
kWh
- -
06 2.9114: Use solar heat to make electricty $37,630 $621,000 $37,630
510,860
kWh
- -
TOTAL RECOMMENDED $59,289 $647,015 $50,694
687,400
kWh
$11,495 $(-2,900.0)
TOTAL IMPLEMENTED $15,490 $3,015 $6,895
93,174
kWh
$11,495 $(-2,900.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs