Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product HUMIDIFIER BELTS/GASKETS
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area
n/a
Annual Production 240,000
lb
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $10,080 144,197
kWh
LPG $10,607 1,164
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,123 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,533

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $590 $1,200 - $590
-
MMBtu
02 2.7243: Improve air circulation with destratification fans / other methods $986 $1,840 $(-89.0)
(-1,172)
kWh
$1,075
-
MMBtu
03 2.7261: Install timers and/or thermostats $4,170 $3,000 - $4,170
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $301 $640 $301
4,396
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $76 $150 $76
1,172
kWh
-
TOTAL RECOMMENDED $6,123 $6,830 $288
4,396
kWh
$5,835
-
MMBtu
TOTAL IMPLEMENTED $5,533 $5,630 $288
4,396
kWh
$5,245
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs