ITAC Assessment: DL0214
ITAC logo
ITAC Assessment: DL0214
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Fuel Cell Server
NAICS 335999: All Other Miscellaneous Electrical Equipment and Component Manufacturing
SIC 3629: Electrical Industrial Apparatus, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 688
Plant Area 76,000
ft2
Annual Production 3,610
units
Production Hrs. Annual 2,289
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,815 474,683
kWh
Electricity Demand $5,043 690
kW-mo/yr
Electricity Fees $9,181 -
Natural Gas $29,472 3,435
MMBtu
TOTAL YEARLY COSTS $102,511
RECOMMENDED SAVINGS* $34,102 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $11,355 - $4,319
31,996
kWh
$7,036
-
MMBtu
02 2.6231: Utilize controls to operate equipment only when needed $3,586 - $3,586
26,565
kWh
-
03 2.7261: Install timers and/or thermostats $5,002 $1,348 - $5,002
-
MMBtu
04 2.6231: Utilize controls to operate equipment only when needed $5,516 $401 $2,002
14,832
kWh
$3,514
-
MMBtu
05 2.6231: Utilize controls to operate equipment only when needed $4,368 $485 $4,368
32,353
kWh
-
06 2.4226: Use / purchase optimum sized compressor $2,919 $16,000 $2,919
21,623
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $735 $755 $735
5,448
kWh
-
08 2.7492: Use proper thickness of insulation on building envelope $621 $2,500 - $621
-
MMBtu
TOTAL RECOMMENDED $34,102 $21,489 $17,929
132,817
kWh
$16,173
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs