ITAC Assessment: WV0461
ITAC logo
ITAC Assessment: WV0461
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product clinical testing material
NAICS 325414: Biological Product (except Diagnostic) Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range greater than $500
M
# of Employees 2,500
Plant Area 816,975
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 8,616
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,129,049 53,270,599
kWh
Electricity Demand $246,777 103,871
kW-mo/yr
Natural Gas $2,685,863 214,869
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $327,016 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $229,040

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2612: Use cooling tower water instead of refrigeration $166,335 $175,000 $159,512
2,058,220
kWh
$6,823
-
kW-mo/yr
- -
02 2.2113: Repair or replace steam traps $84,625 $8,800 - - $86,625
-
MMBtu
$(-2,000.0)
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $40,724 - $39,053
503,912
kWh
$1,671
-
kW-mo/yr
- -
04 2.4224: Upgrade controls on compressors $14,386 $31,000 $13,881
179,116
kWh
$505
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,595 $800 $7,283
93,971
kWh
$312
-
kW-mo/yr
- -
06 2.2136: Install / repair insulation on steam lines $6,538 $1,117 - - $6,538
-
MMBtu
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $4,023 $200 $3,859
49,790
kWh
$164
-
kW-mo/yr
- -
08 2.4151: Develop a repair/replace policy $1,507 $2,350 $1,906
24,598
kWh
$81
-
kW-mo/yr
- $(-480.0)
09 2.4221: Install compressor air intakes in coolest locations $1,283 $3,500 $1,230
15,871
kWh
$53
-
kW-mo/yr
- -
TOTAL RECOMMENDED $327,016 $222,767 $226,724
2,925,478
kWh
$9,609
-
kW-mo/yr
$93,163
-
MMBtu
$(-2,480.0)
TOTAL IMPLEMENTED $229,040 $206,800 $219,729
2,835,219
kWh
$9,311
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs