Assessment Year | 2013 |
---|---|
Principal Product | clinical testing material |
NAICS | 325414: Biological Product (except Diagnostic) Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | greater than $500 M |
# of Employees | 2,500 |
Plant Area |
816,975
ft2
|
Annual Production | 20,000,000
lb
|
Production Hrs. Annual | 8,616
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $4,129,049 | 53,270,599 |
kWh
|
$0.078 |
Electricity Demand | $246,777 | 103,871 |
kW-mo/yr
|
$2.38 |
Natural Gas | $2,685,863 | 214,869 |
MMBtu
|
$12.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $327,016 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $229,040 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2612: Use cooling tower water instead of refrigeration | $166,335 | $175,000 |
$159,512
2,058,220
kWh
|
$6,823
-
kW-mo/yr
|
- | - | |
02 | 2.2113: Repair or replace steam traps | $84,625 | $8,800 | - | - |
$86,625
-
MMBtu
|
$(-2,000.0) | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $40,724 | - |
$39,053
503,912
kWh
|
$1,671
-
kW-mo/yr
|
- | - | |
04 | 2.4224: Upgrade controls on compressors | $14,386 | $31,000 |
$13,881
179,116
kWh
|
$505
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,595 | $800 |
$7,283
93,971
kWh
|
$312
-
kW-mo/yr
|
- | - | |
06 | 2.2136: Install / repair insulation on steam lines | $6,538 | $1,117 | - | - |
$6,538
-
MMBtu
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,023 | $200 |
$3,859
49,790
kWh
|
$164
-
kW-mo/yr
|
- | - | |
08 | 2.4151: Develop a repair/replace policy | $1,507 | $2,350 |
$1,906
24,598
kWh
|
$81
-
kW-mo/yr
|
- | $(-480.0) | |
09 | 2.4221: Install compressor air intakes in coolest locations | $1,283 | $3,500 |
$1,230
15,871
kWh
|
$53
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $327,016 | $222,767 |
$226,724
2,925,478
kWh
|
$9,609
-
kW-mo/yr
|
$93,163
-
MMBtu
|
$(-2,480.0) | ||
TOTAL IMPLEMENTED | $229,040 | $206,800 |
$219,729
2,835,219
kWh
|
$9,311
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs