ITAC Assessment: IA0180
ITAC logo
ITAC Assessment: IA0180
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product travel trailers
NAICS
n/a
SIC 3792: Travel Trailers and Campers
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 86,400
ft2
Annual Production 950
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,005 1,339,097
kWh
Electricity Demand $9,288 5,256
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,723 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,929

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings By-product Production Savings
01 3.5315: Lease / purchase baler; sell cardboard to recycler $45,671 $8,400 - - $19,351
-
lb
$10,000 - - $16,320
02 3.2123: Convert to high volume low pressure (hvlp) paint guns $10,858 $2,000 - - - - $9,820 $1,038 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,423 $992 $5,537
108,734
kWh
$886
-
kW-mo/yr
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,123 $4,378 $960
18,757
kWh
$163
-
kW-mo/yr
- - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $443 $400 $373
7,327
kWh
$70
-
kW-mo/yr
- - - - -
06 2.7135: Install occupancy sensors $699 $931 $699
13,775
kWh
- - - - - -
07 2.4221: Install compressor air intakes in coolest locations $331 $292 $280
5,569
kWh
$51
-
kW-mo/yr
- - - - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $175 $130 $147
2,931
kWh
$28
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $65,723 $17,523 $7,996
157,093
kWh
$1,198
-
kW-mo/yr
$19,351
-
lb
$10,000 $9,820 $1,038 $16,320
TOTAL IMPLEMENTED $6,929 $1,414 $5,964
117,234
kWh
$965
-
kW-mo/yr
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs