ITAC Assessment: DL0132
ITAC logo
ITAC Assessment: DL0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Composite Parts & Laminates
NAICS 326130: Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $5
M
to 10
M
# of Employees 44
Plant Area 47,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,602
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,299 618,785
kWh
Natural Gas $73,756 7,282
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,647 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,440

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,820 $17,500 $10,820
82,600
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,480 $1,375 $3,480
26,019
kWh
-
03 2.4226: Use / purchase optimum sized compressor $2,657 $2,600 $2,657
20,285
kWh
-
04 2.7261: Install timers and/or thermostats $11,450 $1,000 - $11,450
-
MMBtu
05 2.2437: Recover waste heat from equipment $5,000 $3,000 - $5,000
-
MMBtu
06 2.2437: Recover waste heat from equipment $3,800 $4,000 - $3,800
-
MMBtu
07 2.4131: Size electric motors for peak operating efficiency $2,920 $1,000 $2,920
22,329
kWh
-
08 2.6231: Utilize controls to operate equipment only when needed $1,350 $1,600 $1,350
10,290
kWh
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,580 $7,000 $4,580
34,990
kWh
-
10 2.6218: Turn off equipment when not in use $860 - - $860
-
MMBtu
11 2.6218: Turn off equipment when not in use $8,380 - - $8,380
-
MMBtu
12 2.7142: Utilize higher efficiency lamps and/or ballasts $4,320 $13,455 $4,320
32,970
kWh
-
13 2.7142: Utilize higher efficiency lamps and/or ballasts $2,030 $14,000 $2,030
15,475
kWh
-
TOTAL RECOMMENDED $61,647 $66,530 $32,157
244,958
kWh
$29,490
-
MMBtu
TOTAL IMPLEMENTED $33,440 $30,830 $12,750
96,793
kWh
$20,690
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs