ITAC Assessment: CO0221
ITAC logo
ITAC Assessment: CO0221
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product MASS FLOW METERS
NAICS
n/a
SIC 3824: Totalizing Fluid Meters and Counting Devices
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area
n/a
Annual Production 300
pieces
Production Hrs. Annual 5,344
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $264,867 4,294,256
kWh
Natural Gas $17,760 4,695
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,108 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,056 - $3,342
54,220
kWh
- $(-1,286.0)
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $633 $1,200 $633
10,258
kWh
- -
03 2.6232: Install set-back timers $516 $1,200 $516
8,499
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $380 $150 $380
6,155
kWh
- -
05 2.2437: Recover waste heat from equipment $438 $810 - $438
-
MMBtu
-
06 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $1,428 $600 $381
14,654
kWh
$1,047
-
MMBtu
-
07 2.7261: Install timers and/or thermostats $2,100 $4,600 $950
36,635
kWh
$1,150
-
MMBtu
-
08 2.1123: Install automatic stack damper $340 $600 - $340
-
MMBtu
-
09 2.4133: Use most efficient type of electric motors $217 $487 $217
3,517
kWh
- -
TOTAL RECOMMENDED $8,108 $9,647 $6,419
133,938
kWh
$2,975
-
MMBtu
$(-1,286.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs