Assessment Year | 1991 |
---|---|
Principal Product | MASS FLOW METERS |
NAICS |
n/a
|
SIC | 3824: Totalizing Fluid Meters and Counting Devices |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
n/a
|
Annual Production | 300
pieces
|
Production Hrs. Annual | 5,344
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $264,867 | 4,294,256 |
kWh
|
$0.062 |
Natural Gas | $17,760 | 4,695 |
MMBtu
|
$3.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,108 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,056 | - |
$3,342
54,220
kWh
|
- | $(-1,286.0) | |
02 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $633 | $1,200 |
$633
10,258
kWh
|
- | - | |
03 | 2.6232: Install set-back timers | $516 | $1,200 |
$516
8,499
kWh
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $380 | $150 |
$380
6,155
kWh
|
- | - | |
05 | 2.2437: Recover waste heat from equipment | $438 | $810 | - |
$438
-
MMBtu
|
- | |
06 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $1,428 | $600 |
$381
14,654
kWh
|
$1,047
-
MMBtu
|
- | |
07 | 2.7261: Install timers and/or thermostats | $2,100 | $4,600 |
$950
36,635
kWh
|
$1,150
-
MMBtu
|
- | |
08 | 2.1123: Install automatic stack damper | $340 | $600 | - |
$340
-
MMBtu
|
- | |
09 | 2.4133: Use most efficient type of electric motors | $217 | $487 |
$217
3,517
kWh
|
- | - | |
TOTAL RECOMMENDED | $8,108 | $9,647 |
$6,419
133,938
kWh
|
$2,975
-
MMBtu
|
$(-1,286.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs