Assessment Year | 1991 |
---|---|
Principal Product | CANNED FOOD |
NAICS |
n/a
|
SIC | 2032: Canned Specialties |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
n/a
|
Annual Production | 25,000,000
lb
|
Production Hrs. Annual | 2,730
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $98,414 | 1,927,022 |
kWh
|
$0.051 |
Natural Gas | $146,497 | 55,509 |
MMBtu
|
$2.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $80,537 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 3.4115: Recover and reuse cooling water | $52,663 | - |
$1,653
32,239
kWh
|
- | $51,010 | |
02 | 2.2121: Increase amount of condensate returned | $6,000 | - | - |
$2,308
-
MMBtu
|
$3,692 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,900 | $900 |
$1,900
37,808
kWh
|
- | - | |
04 | 2.7261: Install timers and/or thermostats | $1,600 | $700 | - |
$1,600
-
MMBtu
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $1,274 | $2,548 |
$1,274
24,912
kWh
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $400 | $300 |
$400
7,913
kWh
|
- | - | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,700 | $1,500 | - |
$4,700
-
MMBtu
|
- | |
08 | 2.6231: Utilize controls to operate equipment only when needed | $5,100 | $14,500 |
$5,100
99,941
kWh
|
- | - | |
09 | 2.2414: Use waste heat from hot flue gases to preheat | $5,300 | $18,000 | - |
$5,300
-
MMBtu
|
- | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,600 | $4,200 |
$1,600
31,360
kWh
|
- | - | |
TOTAL RECOMMENDED | $80,537 | $42,648 |
$11,927
234,173
kWh
|
$13,908
-
MMBtu
|
$54,702 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs