| Assessment Year | 1985 |
|---|---|
| Principal Product | DETERGENT & WAX |
| NAICS |
n/a
|
| SIC | 2842: Specialty Cleaning, Polishing, and Sanitation Preparations |
| Sales Range | $10 M to 50M |
| # of Employees | 46 |
| Plant Area |
n/a
|
| Annual Production | 2,000
Tgal
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $29,389 | 371,923 |
kWh
|
$0.079 |
| Fuel Oil #2 | $39,316 | 6,615 |
MMBtu
|
$5.94 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $26,786 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,606 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,442 | $2,640 |
$1,769
22,567
kWh
|
- | $673 | |
| 02 | 2.7243: Improve air circulation with destratification fans / other methods | $7,972 | $9,826 |
$(-881.0)
(-11,137)
kWh
|
$8,853
-
MMBtu
|
- | |
| 03 | 2.7229: Air condition only space necessary | $16,180 | $17,180 | - |
$16,180
-
MMBtu
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $192 | $143 |
$192
2,345
kWh
|
- | - | |
| TOTAL RECOMMENDED | $26,786 | $29,789 |
$1,080
13,775
kWh
|
$25,033
-
MMBtu
|
$673 | ||
| TOTAL IMPLEMENTED | $10,606 | $12,609 |
$1,080
13,775
kWh
|
$8,853
-
MMBtu
|
$673 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs