ITAC Assessment: MA0041
ITAC logo
ITAC Assessment: MA0041
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product DETERGENT & WAX
NAICS
n/a
SIC 2842: Specialty Cleaning, Polishing, and Sanitation Preparations
Sales Range $10
M
to 50
M
# of Employees 46
Plant Area
n/a
Annual Production 2,000
Tgal
Production Hrs. Annual 2,080
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,389 371,923
kWh
Fuel Oil #2 $39,316 6,615
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,786 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,606

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,442 $2,640 $1,769
22,567
kWh
- $673
02 2.7243: Improve air circulation with destratification fans / other methods $7,972 $9,826 $(-881.0)
(-11,137)
kWh
$8,853
-
MMBtu
-
03 2.7229: Air condition only space necessary $16,180 $17,180 - $16,180
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $192 $143 $192
2,345
kWh
- -
TOTAL RECOMMENDED $26,786 $29,789 $1,080
13,775
kWh
$25,033
-
MMBtu
$673
TOTAL IMPLEMENTED $10,606 $12,609 $1,080
13,775
kWh
$8,853
-
MMBtu
$673
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs