Assessment Year | 1995 |
---|---|
Principal Product | heating systems and equipments |
NAICS |
n/a
|
SIC | 3567: Industrial Process Furnaces and Ovens |
Sales Range | $50 M to 100M |
# of Employees | 316 |
Plant Area |
150,000
ft2
|
Annual Production | 700
thousand feet
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $262,183 | 3,565,065 |
kWh
|
$0.074 |
Natural Gas | $38,723 | 7,558 |
MMBtu
|
$5.12 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,627 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,044 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 3.4114: Replace city water with recycled water via cooling tower | $17,228 | $23,100 |
$(-1,502.0)
(-20,516)
kWh
|
- |
$18,730
-
Tgal
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,795 | $40,300 |
$9,795
133,353
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,560 | $870 |
$1,560
21,102
kWh
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $2,920 | $8,974 |
$2,920
39,859
kWh
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $754 | $725 |
$754
10,258
kWh
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $789 | $634 |
$789
10,844
kWh
|
- | - | |
07 | 2.4314: Use synthetic lubricant | $420 | $96 |
$420
5,862
kWh
|
- | - | |
08 | 2.6121: Reduce hot water temperature to the minimum required | $161 | $150 | - |
$161
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $33,627 | $74,849 |
$14,736
200,762
kWh
|
$161
-
MMBtu
|
$18,730
-
Tgal
|
||
TOTAL IMPLEMENTED | $5,044 | $10,579 |
$4,883
66,823
kWh
|
$161
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs