ITAC Assessment: UD1101
ITAC logo
ITAC Assessment: UD1101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Medical Equipment
NAICS 339115: Ophthalmic Goods Manufacturing
SIC 3827: Optical Instruments and Lenses
Sales Range $50
M
to 100
M
# of Employees 153
Plant Area 78,010
ft2
Annual Production 1
units
Production Hrs. Annual 2,080
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,837 1,111,301
kWh
Electricity Demand $49,339 3,767
kW-mo/yr
Electricity Fees $2,205 -
Natural Gas $79,272 9,727
MMBtu
Waste Disposal Costs
Water Usage $7,552 362
Tgal
Water Disposal $2,126 362
Tgal
Other Liquid (non-haz) $1,782 1
gal
TOTAL YEARLY COSTS $233,113
RECOMMENDED SAVINGS* $31,616 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings
01 2.6218: Turn off equipment when not in use $8,143 - $8,143
99,666
kWh
- - - - -
02 2.4239: Eliminate or reduce compressed air usage $9,997 $6,792 $9,997
122,367
kWh
- - - - -
03 2.4239: Eliminate or reduce compressed air usage $4,750 $7,500 $2,864
35,051
kWh
$1,886
-
kW-mo/yr
- - - -
04 2.4221: Install compressor air intakes in coolest locations $1,619 $1,015 $1,326
16,234
kWh
$293
-
kW-mo/yr
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,284 - $1,053
12,892
kWh
$231
-
kW-mo/yr
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,266 $952 $1,038
12,707
kWh
$228
-
kW-mo/yr
- - - -
07 2.2437: Recover waste heat from equipment $2,622 $4,975 $(-142.0)
(-1,741)
kWh
$(-31.0)
-
kW-mo/yr
- $2,795
-
MMBtu
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $430 $1,040 $129
1,581
kWh
$119
-
kW-mo/yr
- - $89 $93
09 2.7111: Reduce illumination to minimum necessary levels $310 $1,350 $51
624
kWh
$47
-
kW-mo/yr
- - $150 $62
10 2.7135: Install occupancy sensors $94 - $9
112
kWh
$47
-
kW-mo/yr
- - $27 $11
11 2.3212: Optimize plant power factor $1,101 $4,400 - - $1,101 - - -
TOTAL RECOMMENDED $31,616 $28,024 $24,468
299,493
kWh
$2,820
-
kW-mo/yr
$1,101 $2,795
-
MMBtu
$266 $166
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs