ITAC Assessment: CO0191
ITAC logo
ITAC Assessment: CO0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product FILM FOR CIRCUIT BOARDS
NAICS
n/a
SIC 3624: Carbon and Graphite Products
Sales Range $10
M
to 50
M
# of Employees 320
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 8,736
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $855,034 17,808,031
kWh
Natural Gas $282,182 77,282
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,038 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,338

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $13,200 $6,600 $13,200
275,791
kWh
-
02 2.4133: Use most efficient type of electric motors $4,900 $3,517 $4,900
102,286
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $14,407 $6,362 $14,407
300,410
kWh
-
04 2.7261: Install timers and/or thermostats $9,070 $2,400 $8,720
163,540
kWh
$350
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,198 $4,667 $1,198
24,912
kWh
-
06 2.6232: Install set-back timers $3,236 $5,000 $3,236
67,409
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $2,997 $2,000 $2,997
62,427
kWh
-
08 2.7261: Install timers and/or thermostats $3,330 $3,000 $1,830
38,101
kWh
$1,500
-
MMBtu
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,700 $5,700 $2,700
55,979
kWh
-
TOTAL RECOMMENDED $55,038 $39,246 $53,188
1,090,855
kWh
$1,850
-
MMBtu
TOTAL IMPLEMENTED $52,338 $33,546 $50,488
1,034,876
kWh
$1,850
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs