ITAC Assessment: CO0178
ITAC logo
ITAC Assessment: CO0178
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product BRIDGE SUPPORT SYSTEMS
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 12,000
ton
Production Hrs. Annual 4,640
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,942 1,546,893
kWh
Natural Gas $44,605 9,950
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,893 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,893

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3513: Consider power loss as well as initial loads and load growth in down-sizing transformers $5,140 $600 $5,140
84,701
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $4,660 $400 $4,660
76,788
kWh
-
03 2.7442: Keep doors and windows shut when not on use $3,650 $1,100 - $3,650
-
MMBtu
04 2.2437: Recover waste heat from equipment $2,050 $1,500 - $2,050
-
MMBtu
05 2.7447: Install vinyl strip / high speed / air curtain doors $390 $1,000 - $390
-
MMBtu
06 2.7261: Install timers and/or thermostats $400 $150 - $400
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $283 $325 $283
4,689
kWh
-
08 2.6212: Turn off equipment during breaks, reduce operating time $320 $300 $320
5,275
kWh
-
TOTAL RECOMMENDED $16,893 $5,375 $10,403
171,453
kWh
$6,490
-
MMBtu
TOTAL IMPLEMENTED $16,893 $5,375 $10,403
171,453
kWh
$6,490
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs