Assessment Year | 1990 |
---|---|
Principal Product | BRIDGE SUPPORT SYSTEMS |
NAICS |
n/a
|
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
n/a
|
Annual Production | 12,000
ton
|
Production Hrs. Annual | 4,640
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $93,942 | 1,546,893 |
kWh
|
$0.061 |
Natural Gas | $44,605 | 9,950 |
MMBtu
|
$4.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,893 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,893 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.3513: Consider power loss as well as initial loads and load growth in down-sizing transformers | $5,140 | $600 |
$5,140
84,701
kWh
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $4,660 | $400 |
$4,660
76,788
kWh
|
- | |
03 | 2.7442: Keep doors and windows shut when not on use | $3,650 | $1,100 | - |
$3,650
-
MMBtu
|
|
04 | 2.2437: Recover waste heat from equipment | $2,050 | $1,500 | - |
$2,050
-
MMBtu
|
|
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $390 | $1,000 | - |
$390
-
MMBtu
|
|
06 | 2.7261: Install timers and/or thermostats | $400 | $150 | - |
$400
-
MMBtu
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $283 | $325 |
$283
4,689
kWh
|
- | |
08 | 2.6212: Turn off equipment during breaks, reduce operating time | $320 | $300 |
$320
5,275
kWh
|
- | |
TOTAL RECOMMENDED | $16,893 | $5,375 |
$10,403
171,453
kWh
|
$6,490
-
MMBtu
|
||
TOTAL IMPLEMENTED | $16,893 | $5,375 |
$10,403
171,453
kWh
|
$6,490
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs