| Assessment Year | 1990 |
|---|---|
| Principal Product | BRIDGE SUPPORT SYSTEMS |
| NAICS |
n/a
|
| SIC | 3441: Fabricated Structural Metal |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
n/a
|
| Annual Production | 12,000
ton
|
| Production Hrs. Annual | 4,640
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $93,942 | 1,546,893 |
kWh
|
$0.061 |
| Natural Gas | $44,605 | 9,950 |
MMBtu
|
$4.48 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $16,893 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,893 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3513: Consider power loss as well as initial loads and load growth in down-sizing transformers | $5,140 | $600 |
$5,140
84,701
kWh
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $4,660 | $400 |
$4,660
76,788
kWh
|
- | |
| 03 | 2.7442: Keep doors and windows shut when not on use | $3,650 | $1,100 | - |
$3,650
-
MMBtu
|
|
| 04 | 2.2437: Recover waste heat from equipment | $2,050 | $1,500 | - |
$2,050
-
MMBtu
|
|
| 05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $390 | $1,000 | - |
$390
-
MMBtu
|
|
| 06 | 2.7261: Install timers and/or thermostats | $400 | $150 | - |
$400
-
MMBtu
|
|
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $283 | $325 |
$283
4,689
kWh
|
- | |
| 08 | 2.6212: Turn off equipment during breaks, reduce operating time | $320 | $300 |
$320
5,275
kWh
|
- | |
| TOTAL RECOMMENDED | $16,893 | $5,375 |
$10,403
171,453
kWh
|
$6,490
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $16,893 | $5,375 |
$10,403
171,453
kWh
|
$6,490
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs