ITAC Assessment: OK0542
ITAC logo
ITAC Assessment: OK0542
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Speaker Cabinets and Plastic Grills
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range n/a
# of Employees 150
Plant Area 60,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,047 458,089
kWh
Electricity Fees $588 -
Natural Gas $6,878 1,061
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,740 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,183

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,828 $13,930 $4,580
67,116
kWh
- - - $248
02 2.8112: Combine utility meters $2,565 $6,000 - $2,565 - - -
03 2.7135: Install occupancy sensors $729 $2,301 $729
10,551
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $250 $167 $144
2,052
kWh
- - $46 $60
05 4.423: Move product using mechanical means $7,373 $4,040 - - - $7,373 -
06 3.5311: Recover and reuse waste material $43,995 $31,191 - - $43,995
-
lb
- -
TOTAL RECOMMENDED $59,740 $57,629 $5,453
79,719
kWh
$2,565 $43,995
-
lb
$7,419 $308
TOTAL IMPLEMENTED $54,183 $41,398 $144
2,052
kWh
$2,565 $43,995
-
lb
$7,419 $60
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs