Assessment Year | 1988 |
---|---|
Principal Product | COMMERCIAL PRINTING |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $1 M to 5M |
# of Employees | 65 |
Plant Area |
n/a
|
Annual Production | 8,667,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $50,429 | 1,067,702 |
kWh
|
$0.047 |
Natural Gas | $6,300 | 1,507 |
MMBtu
|
$4.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,616 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,098 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $780 | $700 | - |
$780
-
MMBtu
|
|
02 | 2.3212: Optimize plant power factor | $1,140 | $1,900 |
$1,140
-
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $126 | $200 |
$126
2,638
kWh
|
- | |
04 | 2.7261: Install timers and/or thermostats | $672 | $750 | - |
$672
-
MMBtu
|
|
05 | 2.7226: Use computer programs to optimize hvac performance | $772 | $150 |
$772
29,601
kWh
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,518 | $1,330 |
$1,518
32,239
kWh
|
- | |
07 | 2.7446: Utilize sensors controlling roof and wall openings | $944 | $800 |
$231
8,792
kWh
|
$713
-
MMBtu
|
|
08 | 2.8121: Apply for tax-free status for energy purchases | $1,566 | $250 |
$1,402
-
kWh
|
$164
-
MMBtu
|
|
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,098 | $535 |
$1,098
23,154
kWh
|
- | |
TOTAL RECOMMENDED | $8,616 | $6,615 |
$6,287
96,424
kWh
|
$2,329
-
MMBtu
|
||
TOTAL IMPLEMENTED | $7,098 | $5,285 |
$4,769
64,185
kWh
|
$2,329
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs