Assessment Year | 1987 |
---|---|
Principal Product | CORRUGATED STEEL & ALUMINUM PIPE |
NAICS |
n/a
|
SIC | 3317: Steel Pipe and Tubes |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
n/a
|
Annual Production | 15,000
ton
|
Production Hrs. Annual | 2,288
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $105,942 | 2,106,975 |
kWh
|
$0.050 |
Natural Gas | $106,061 | 26,707 |
MMBtu
|
$3.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,531 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,732 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,314 | $500 |
$2,314
46,014
kWh
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,349 | $400 |
$1,349
26,964
kWh
|
- | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,535 | $576 | - |
$1,535
-
MMBtu
|
|
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,336 | $300 | - |
$1,336
-
MMBtu
|
|
05 | 2.2414: Use waste heat from hot flue gases to preheat | $2,799 | $10,000 | - |
$2,799
-
MMBtu
|
|
06 | 2.1222: Install turbulators | $457 | $720 | - |
$457
-
MMBtu
|
|
07 | 2.7261: Install timers and/or thermostats | $9,979 | $4,500 | - |
$9,979
-
MMBtu
|
|
08 | 2.2136: Install / repair insulation on steam lines | $504 | $2,200 | - |
$504
-
MMBtu
|
|
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $258 | $114 |
$258
5,275
kWh
|
- | |
TOTAL RECOMMENDED | $20,531 | $19,310 |
$3,921
78,253
kWh
|
$16,610
-
MMBtu
|
||
TOTAL IMPLEMENTED | $17,732 | $9,310 |
$3,921
78,253
kWh
|
$13,811
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs