ITAC Assessment: CO0094
ITAC logo
ITAC Assessment: CO0094
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product CORRUGATED STEEL & ALUMINUM PIPE
NAICS
n/a
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 15,000
ton
Production Hrs. Annual 2,288
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,942 2,106,975
kWh
Natural Gas $106,061 26,707
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,531 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,732

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,314 $500 $2,314
46,014
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $1,349 $400 $1,349
26,964
kWh
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $1,535 $576 - $1,535
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,336 $300 - $1,336
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $2,799 $10,000 - $2,799
-
MMBtu
06 2.1222: Install turbulators $457 $720 - $457
-
MMBtu
07 2.7261: Install timers and/or thermostats $9,979 $4,500 - $9,979
-
MMBtu
08 2.2136: Install / repair insulation on steam lines $504 $2,200 - $504
-
MMBtu
09 2.7142: Utilize higher efficiency lamps and/or ballasts $258 $114 $258
5,275
kWh
-
TOTAL RECOMMENDED $20,531 $19,310 $3,921
78,253
kWh
$16,610
-
MMBtu
TOTAL IMPLEMENTED $17,732 $9,310 $3,921
78,253
kWh
$13,811
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs