| Assessment Year | 1987 |
|---|---|
| Principal Product | CORRUGATED STEEL & ALUMINUM PIPE |
| NAICS |
n/a
|
| SIC | 3317: Steel Pipe and Tubes |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
n/a
|
| Annual Production | 15,000
ton
|
| Production Hrs. Annual | 2,288
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $105,942 | 2,106,975 |
kWh
|
$0.050 |
| Natural Gas | $106,061 | 26,707 |
MMBtu
|
$3.97 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $20,531 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,732 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,314 | $500 |
$2,314
46,014
kWh
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $1,349 | $400 |
$1,349
26,964
kWh
|
- | |
| 03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,535 | $576 | - |
$1,535
-
MMBtu
|
|
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,336 | $300 | - |
$1,336
-
MMBtu
|
|
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $2,799 | $10,000 | - |
$2,799
-
MMBtu
|
|
| 06 | 2.1222: Install turbulators | $457 | $720 | - |
$457
-
MMBtu
|
|
| 07 | 2.7261: Install timers and/or thermostats | $9,979 | $4,500 | - |
$9,979
-
MMBtu
|
|
| 08 | 2.2136: Install / repair insulation on steam lines | $504 | $2,200 | - |
$504
-
MMBtu
|
|
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $258 | $114 |
$258
5,275
kWh
|
- | |
| TOTAL RECOMMENDED | $20,531 | $19,310 |
$3,921
78,253
kWh
|
$16,610
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $17,732 | $9,310 |
$3,921
78,253
kWh
|
$13,811
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs