ITAC Assessment: WV0476
ITAC logo
ITAC Assessment: WV0476
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product electronic connectors and cables
NAICS 334417: Electronic Connector Manufacturing
SIC 3678: Electronic Connectors
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 126,000
ft2
Annual Production 200,000
units
Production Hrs. Annual 2,288
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,536 1,098,885
kWh
Electricity Demand $36,714 4,979
kW-mo/yr
Natural Gas $40,446 5,221
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,352 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,643

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,046 $26,555 $10,801
115,768
kWh
$4,245
-
kW-mo/yr
- -
02 2.7261: Install timers and/or thermostats $13,346 $4,200 - - $13,346
-
MMBtu
-
03 2.8112: Combine utility meters $3,940 $1,800 - - - $3,940
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,749 $5,400 - $2,749
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $845 $1,940 - - $845
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $756 $3,667 $756
8,103
kWh
- - -
07 2.7229: Air condition only space necessary $643 $3,920 - - $643
-
MMBtu
-
08 2.4239: Eliminate or reduce compressed air usage $621 $233 $437
4,689
kWh
$184
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $595 $1,431 $411
4,404
kWh
$184
-
kW-mo/yr
- -
10 2.4235: Remove or close off unneeded compressed air lines $301 $90 $213
2,283
kWh
$88
-
kW-mo/yr
- -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $259 $140 $185
1,980
kWh
$74
-
kW-mo/yr
- -
12 2.4231: Reduce the pressure of compressed air to the minimum required $251 $50 $177
1,902
kWh
$74
-
kW-mo/yr
- -
TOTAL RECOMMENDED $39,352 $49,426 $12,980
139,129
kWh
$7,598
-
kW-mo/yr
$14,834
-
MMBtu
$3,940
TOTAL IMPLEMENTED $30,643 $34,406 $11,787
126,337
kWh
$4,665
-
kW-mo/yr
$14,191
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs