Assessment Year | 1997 |
---|---|
Principal Product | Printed wiring assemblies for airborne radar equipment, moda |
NAICS |
n/a
|
SIC | 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
154,320
ft2
|
Annual Production | 12,050
pieces
|
Production Hrs. Annual | 3,751
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $206,620 | 7,104,338 |
kWh
|
$0.029 |
Electricity Demand | $133,947 | 14,472 |
kW-mo/yr
|
$9.26 |
Electricity Fees | $5,122 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $76,020 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $72,930 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $33,000 | $80,500 |
$13,750
398,593
kWh
|
$4,000
-
kW-mo/yr
|
- | - | $15,250 | - | |
02 | 3.3125: Use distillation, evaporation to remove contaminants | $17,850 | $16,760 | - | - |
$17,850
-
gal
|
- | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,500 | $29,520 |
$16,500
477,726
kWh
|
- | - | - | - | - | |
04 | 3.4116: Meter recycled water (to reduce sewer charges) | $2,700 | $8,000 | - | - | - | - | - | $2,700 | |
05 | 2.7131: Add area lighting switches | $2,070 | $560 |
$2,070
59,789
kWh
|
- | - | - | - | - | |
06 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,860 | - | - | - | - |
$1,860
-
lb
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,230 | $1,140 |
$250
7,327
kWh
|
$90
-
kW-mo/yr
|
- | - | $890 | - | |
08 | 2.4314: Use synthetic lubricant | $520 | - |
$300
8,792
kWh
|
$220
-
kW-mo/yr
|
- | - | - | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $290 | $200 |
$290
8,499
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $76,020 | $136,680 |
$33,160
960,726
kWh
|
$4,310
-
kW-mo/yr
|
$17,850
-
gal
|
$1,860
-
lb
|
$16,140 | $2,700 | ||
TOTAL IMPLEMENTED | $72,930 | $135,540 |
$32,910
953,399
kWh
|
$4,220
-
kW-mo/yr
|
$17,850
-
gal
|
- | $15,250 | $2,700 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs