ITAC Assessment: AM0299
ITAC logo
ITAC Assessment: AM0299
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Printed wiring assemblies for airborne radar equipment, moda
NAICS
n/a
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 154,320
ft2
Annual Production 12,050
pieces
Production Hrs. Annual 3,751
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $206,620 7,104,338
kWh
Electricity Demand $133,947 14,472
kW-mo/yr
Electricity Fees $5,122 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,020 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $72,930

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $33,000 $80,500 $13,750
398,593
kWh
$4,000
-
kW-mo/yr
- - $15,250 -
02 3.3125: Use distillation, evaporation to remove contaminants $17,850 $16,760 - - $17,850
-
gal
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,500 $29,520 $16,500
477,726
kWh
- - - - -
04 3.4116: Meter recycled water (to reduce sewer charges) $2,700 $8,000 - - - - - $2,700
05 2.7131: Add area lighting switches $2,070 $560 $2,070
59,789
kWh
- - - - -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $1,860 - - - - $1,860
-
lb
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,230 $1,140 $250
7,327
kWh
$90
-
kW-mo/yr
- - $890 -
08 2.4314: Use synthetic lubricant $520 - $300
8,792
kWh
$220
-
kW-mo/yr
- - - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $290 $200 $290
8,499
kWh
- - - - -
TOTAL RECOMMENDED $76,020 $136,680 $33,160
960,726
kWh
$4,310
-
kW-mo/yr
$17,850
-
gal
$1,860
-
lb
$16,140 $2,700
TOTAL IMPLEMENTED $72,930 $135,540 $32,910
953,399
kWh
$4,220
-
kW-mo/yr
$17,850
-
gal
- $15,250 $2,700
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs