| Assessment Year | 1986 |
|---|---|
| Principal Product | COMMERCIAL TABLES |
| NAICS |
n/a
|
| SIC | 2599: Furniture and Fixtures, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 138 |
| Plant Area |
n/a
|
| Annual Production | 185,800
pieces
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $39,441 | 453,986 |
kWh
|
$0.087 |
| Natural Gas | $35,817 | 6,349 |
MMBtu
|
$5.64 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $43,293 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $36,793 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $6,084 | $450 | - |
$6,084
-
MMBtu
|
- | |
| 02 | 2.7492: Use proper thickness of insulation on building envelope | $1,231 | $1,904 | - |
$1,231
-
MMBtu
|
- | |
| 03 | 2.7261: Install timers and/or thermostats | $2,654 | $1,100 | - |
$2,654
-
MMBtu
|
- | |
| 04 | 3.6123: Burn wood by-products for heat | $27,671 | $32,700 | - |
$20,586
-
MMBtu
|
$7,085 | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,134 | $400 |
$2,134
24,619
kWh
|
- | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $176 | $500 |
$176
2,052
kWh
|
- | - | |
| 07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $416 | $400 | - |
$416
-
MMBtu
|
- | |
| 08 | 2.6212: Turn off equipment during breaks, reduce operating time | $340 | $100 |
$81
879
kWh
|
$259
-
MMBtu
|
- | |
| 09 | 2.6212: Turn off equipment during breaks, reduce operating time | $405 | $100 |
$405
4,689
kWh
|
- | - | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,182 | $1,183 |
$2,182
25,205
kWh
|
- | - | |
| TOTAL RECOMMENDED | $43,293 | $38,837 |
$4,978
57,444
kWh
|
$31,230
-
MMBtu
|
$7,085 | ||
| TOTAL IMPLEMENTED | $36,793 | $37,987 |
$4,978
57,444
kWh
|
$24,730
-
MMBtu
|
$7,085 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||