ITAC Assessment: LM0079
ITAC logo
ITAC Assessment: LM0079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product plastics vacuum formed
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 21
Plant Area 47,000
ft2
Annual Production 420,000
lb
Production Hrs. Annual 2,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,205 852,310
kWh
Electricity Demand $21,603 8,376
kW-mo/yr
Electricity Fees $6,451 -
Natural Gas $18,570 2,513
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,097 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,448 $410 $3,494
70,458
kWh
$954
-
kW-mo/yr
- - -
02 2.4238: Do not use compressed air for personal cooling $846 $30 $665
13,182
kWh
$181
-
kW-mo/yr
- - -
03 4.513: Re-arrange equipment layout to reduce labor costs $5,758 $8,250 - - $5,758 - -
04 4.431: Train operators for maximum operating efficiency $13,000 $3,122 - - - - $13,000
05 4.322: Eliminate old stock and modify inventory control $1,045 - - - - $1,045 -
TOTAL RECOMMENDED $25,097 $11,812 $4,159
83,640
kWh
$1,135
-
kW-mo/yr
$5,758 $1,045 $13,000
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs