ITAC Assessment: MI0253
ITAC logo
ITAC Assessment: MI0253
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Pharmacuticals
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 240,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $731,608 14,720,870
kWh
Electricity Demand $331,569 24,758
kW-mo/yr
Electricity Fees $161,351 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $340,867 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $126,302

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2628: Utilize a less expensive cooling method $174,761 $506,800 $122,286
2,445,728
kWh
$52,475
-
kW-mo/yr
02 2.7221: Lower temperature during the winter season and vice-versa $53,448 $80 $37,393
747,859
kWh
$16,055
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $43,154 $52,122 $30,192
603,832
kWh
$12,962
-
kW-mo/yr
04 2.7135: Install occupancy sensors $36,919 $2,300 $25,833
516,672
kWh
$11,086
-
kW-mo/yr
05 2.7425: Clean or color roof to reduce solar load $22,448 $1,680 $15,707
314,132
kWh
$6,741
-
kW-mo/yr
06 2.7425: Clean or color roof to reduce solar load $4,676 $1,660 $1,452
29,032
kWh
$3,224
-
kW-mo/yr
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,885 $4,840 $2,015
40,050
kWh
$870
-
kW-mo/yr
08 2.4231: Reduce the pressure of compressed air to the minimum required $2,576 $80 $1,291
25,828
kWh
$1,285
-
kW-mo/yr
TOTAL RECOMMENDED $340,867 $569,562 $236,169
4,723,133
kWh
$104,698
-
kW-mo/yr
TOTAL IMPLEMENTED $126,302 $55,622 $86,035
1,720,683
kWh
$40,267
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings