ITAC Assessment: BD0275
ITAC logo
ITAC Assessment: BD0275
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Steel Sheet and Bar Products
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 438
Plant Area 842,058
ft2
Annual Production 660,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $724,719 12,806,229
kWh
Electricity Fees $142,183 -
Natural Gas $798,154 118,545
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $526,319 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $467,103

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.7231: Use radiant heater for spot heating $40,891 $81,000 - $40,891
-
MMBtu
- - -
02 2.7495: Install replacement doors $13,598 $40,000 - $13,598
-
MMBtu
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,985 $421 $5,985
110,290
kWh
- - - -
04 2.7135: Install occupancy sensors $5,242 $3,150 $5,242
92,620
kWh
- - - -
05 2.2414: Use waste heat from hot flue gases to preheat $3,674 $6,000 $(-210.0)
(-3,120)
kWh
$3,884
-
MMBtu
- - -
06 2.4133: Use most efficient type of electric motors $3,106 $6,980 $3,106
54,876
kWh
- - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,119 $6,000 $1,119
19,672
kWh
- - - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,053 $470 $1,053
18,594
kWh
- - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $391 $360 $226
3,995
kWh
- $69 - $96
10 4.445: Install equipment to move product $262,080 $80,000 - - $262,080 - -
11 4.441: Install automatic packing equipment $121,680 $500,000 - - $121,680 - -
12 4.322: Eliminate old stock and modify inventory control $67,500 $2,580 - - - $67,500 -
TOTAL RECOMMENDED $526,319 $726,961 $16,521
296,927
kWh
$58,373
-
MMBtu
$383,829 $67,500 $96
TOTAL IMPLEMENTED $467,103 $599,491 $15,678
281,453
kWh
- $383,829 $67,500 $96