| Assessment Year | 1993 |
|---|---|
| Principal Product | WALLBOARD |
| NAICS |
n/a
|
| SIC | 3275: Gypsum Products |
| Sales Range | $10 M to 50M |
| # of Employees | 60 |
| Plant Area |
n/a
|
| Annual Production | 105,000
thousand feet
|
| Production Hrs. Annual | 5,404
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $460,913 | 6,016,120 |
kWh
|
$0.077 |
| Natural Gas | $1,056,632 | 280,614 |
MMBtu
|
$3.77 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $76,689 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,426 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,057 | - |
$1,145
14,947
kWh
|
$(-88.0) | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $408 | $324 |
$447
5,862
kWh
|
$(-39.0) | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $869 | $1,740 |
$869
11,430
kWh
|
- | |
| 04 | 2.7134: Use photocell controls | $1,567 | $950 |
$1,437
18,757
kWh
|
$130 | |
| 05 | 2.7135: Install occupancy sensors | $893 | $1,200 |
$893
11,723
kWh
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,919 | $900 |
$1,919
25,205
kWh
|
- | |
| 07 | 2.4314: Use synthetic lubricant | $2,881 | $2,925 |
$2,137
27,843
kWh
|
$744 | |
| 08 | 2.4133: Use most efficient type of electric motors | $4,581 | $3,412 |
$4,581
59,789
kWh
|
- | |
| 09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $10,126 | - |
$10,126
132,181
kWh
|
- | |
| 10 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $1,614 | $4,250 |
$1,614
21,102
kWh
|
- | |
| 11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $198 | $600 |
$198
2,638
kWh
|
- | |
| 12 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $50,576 | $50,000 |
$50,576
506,155
kWh
|
- | |
| TOTAL RECOMMENDED | $76,689 | $66,301 |
$75,942
837,632
kWh
|
$747 | ||
| TOTAL IMPLEMENTED | $8,426 | $6,052 |
$8,514
111,371
kWh
|
$(-88.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs