ITAC Assessment: AS0099
ITAC logo
ITAC Assessment: AS0099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product WALLBOARD
NAICS
n/a
SIC 3275: Gypsum Products
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area
n/a
Annual Production 105,000
thousand feet
Production Hrs. Annual 5,404
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $460,913 6,016,120
kWh
Natural Gas $1,056,632 280,614
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,689 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,426

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,057 - $1,145
14,947
kWh
$(-88.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $408 $324 $447
5,862
kWh
$(-39.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $869 $1,740 $869
11,430
kWh
-
04 2.7134: Use photocell controls $1,567 $950 $1,437
18,757
kWh
$130
05 2.7135: Install occupancy sensors $893 $1,200 $893
11,723
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,919 $900 $1,919
25,205
kWh
-
07 2.4314: Use synthetic lubricant $2,881 $2,925 $2,137
27,843
kWh
$744
08 2.4133: Use most efficient type of electric motors $4,581 $3,412 $4,581
59,789
kWh
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $10,126 - $10,126
132,181
kWh
-
10 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $1,614 $4,250 $1,614
21,102
kWh
-
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $198 $600 $198
2,638
kWh
-
12 2.3131: Reschedule plant operations or reduce load to avoid peaks $50,576 $50,000 $50,576
506,155
kWh
-
TOTAL RECOMMENDED $76,689 $66,301 $75,942
837,632
kWh
$747
TOTAL IMPLEMENTED $8,426 $6,052 $8,514
111,371
kWh
$(-88.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs