| Assessment Year | 1986 |
|---|---|
| Principal Product | PAINTS & BLENDED ITEMS |
| NAICS |
n/a
|
| SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
n/a
|
| Annual Production | 1,600
Tgal
|
| Production Hrs. Annual | 2,912
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $87,522 | 1,016,120 |
kWh
|
$0.086 |
| Natural Gas | $31,067 | 6,661 |
MMBtu
|
$4.66 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,847 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,665 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,978 | $200 |
$2,978
34,584
kWh
|
- | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $252 | $200 |
$252
2,931
kWh
|
- | |
| 03 | 2.2437: Recover waste heat from equipment | $308 | $250 | - |
$308
-
MMBtu
|
|
| 04 | 2.7492: Use proper thickness of insulation on building envelope | $503 | $690 | - |
$503
-
MMBtu
|
|
| 05 | 2.7226: Use computer programs to optimize hvac performance | $1,388 | $2,100 |
$1,388
16,120
kWh
|
- | |
| 06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $829 | $260 | - |
$829
-
MMBtu
|
|
| 07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $600 | $1,200 |
$782
9,086
kWh
|
$(-182.0)
-
MMBtu
|
|
| 08 | 2.7243: Improve air circulation with destratification fans / other methods | $3,079 | $9,800 |
$(-1,287.0)
(-14,947)
kWh
|
$4,366
-
MMBtu
|
|
| 09 | 2.7261: Install timers and/or thermostats | $3,900 | $3,000 | - |
$3,900
-
MMBtu
|
|
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,010 | $1,054 |
$1,010
11,723
kWh
|
- | |
| TOTAL RECOMMENDED | $14,847 | $18,754 |
$5,123
59,497
kWh
|
$9,724
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $10,665 | $7,064 |
$5,628
65,358
kWh
|
$5,037
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs