Assessment Year | 1986 |
---|---|
Principal Product | PLASTIC BOTTLES |
NAICS |
n/a
|
SIC | 3085: Plastics Bottles |
Sales Range | $10 M to 50M |
# of Employees | 27 |
Plant Area |
n/a
|
Annual Production | 40,000,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $158,595 | 3,288,101 |
kWh
|
$0.048 |
Natural Gas | $25,048 | 5,119 |
MMBtu
|
$4.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,607 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,755 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $1,025 | $1,200 | - |
$1,025
-
MMBtu
|
|
02 | 2.7492: Use proper thickness of insulation on building envelope | $673 | $1,100 | - |
$673
-
MMBtu
|
|
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,522 | $280 | - |
$1,522
-
MMBtu
|
|
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $7,947 | $3,700 | - |
$7,947
-
MMBtu
|
|
05 | 2.7243: Improve air circulation with destratification fans / other methods | $4,464 | $4,000 |
$(-253.0)
(-5,275)
kWh
|
$4,717
-
MMBtu
|
|
06 | 2.4221: Install compressor air intakes in coolest locations | $1,436 | $1,100 |
$1,436
29,894
kWh
|
- | |
07 | 2.4312: Improve lubrication practices | $1,616 | - |
$1,616
33,411
kWh
|
- | |
08 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $10,332 | $4,000 |
$10,332
214,244
kWh
|
- | |
09 | 2.4322: Use or replace with energy efficient substitutes | $8,286 | $50,000 |
$8,286
171,747
kWh
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,306 | $842 |
$3,306
68,581
kWh
|
- | |
TOTAL RECOMMENDED | $40,607 | $66,222 |
$24,723
512,602
kWh
|
$15,884
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,755 | $52,322 |
$13,208
273,739
kWh
|
$2,547
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs