ITAC Assessment: CO0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product PLASTIC INJECTION-MOLD PARTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 70
Plant Area
n/a
Annual Production 150,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,636 1,471,864
kWh
Natural Gas $6,607 1,664
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,434 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $1,958 $500 $1,958
35,756
kWh
-
02 2.7229: Air condition only space necessary $809 $500 - $809
-
MMBtu
03 2.7226: Use computer programs to optimize hvac performance $2,508 $177 $369
6,741
kWh
$2,139
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,552 $190 - $1,552
-
MMBtu
05 2.4312: Improve lubrication practices $1,043 - $1,043
19,050
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $578 $200 $578
10,551
kWh
-
07 2.7492: Use proper thickness of insulation on building envelope $189 $280 - $189
-
MMBtu
08 2.6218: Turn off equipment when not in use $80 $100 $80
1,465
kWh
-
09 2.7262: Separate controls of air handlers from ac/ heating systems $305 $400 $305
5,569
kWh
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,412 $476 $1,412
25,791
kWh
-
TOTAL RECOMMENDED $10,434 $2,823 $5,745
104,923
kWh
$4,689
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs