| Assessment Year | 1985 |
|---|---|
| Principal Product | FABRICATED VEHICLE EQUIP |
| NAICS |
n/a
|
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 230 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,160
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $140,680 | 2,895,076 |
kWh
|
$0.049 |
| Natural Gas | $90,399 | 19,967 |
MMBtu
|
$4.53 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $31,736 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $26,815 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,161 | $6,500 |
$4,716
132,181
kWh
|
$(-2,555.0)
-
MMBtu
|
|
| 02 | 2.7261: Install timers and/or thermostats | $16,221 | $2,791 |
$2,264
46,600
kWh
|
$13,957
-
MMBtu
|
|
| 03 | 2.6212: Turn off equipment during breaks, reduce operating time | $888 | $200 | - |
$888
-
MMBtu
|
|
| 04 | 2.4221: Install compressor air intakes in coolest locations | $159 | $200 |
$159
3,224
kWh
|
- | |
| 05 | 2.7492: Use proper thickness of insulation on building envelope | $1,313 | $1,600 | - |
$1,313
-
MMBtu
|
|
| 06 | 2.7441: Replace broken windows and/or window sash | $6,022 | $1,570 |
$28
586
kWh
|
$5,994
-
MMBtu
|
|
| 07 | 2.7494: Install storm windows and doors | $985 | $750 | - |
$985
-
MMBtu
|
|
| 08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,212 | $800 | - |
$2,212
-
MMBtu
|
|
| 09 | 2.1222: Install turbulators | $793 | $1,000 | - |
$793
-
MMBtu
|
|
| 10 | 2.4312: Improve lubrication practices | $157 | - |
$157
3,224
kWh
|
- | |
| 11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $825 | $3,564 |
$825
16,999
kWh
|
- | |
| TOTAL RECOMMENDED | $31,736 | $18,975 |
$8,149
202,814
kWh
|
$23,587
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $26,815 | $7,161 |
$2,451
50,410