Assessment Year | 1985 |
---|---|
Principal Product | FLOW METERS |
NAICS |
n/a
|
SIC | 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
n/a
|
Annual Production | 5,500
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $46,866 | 873,974 |
kWh
|
$0.054 |
Natural Gas | $8,080 | 1,662 |
MMBtu
|
$4.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,665 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,689 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,760 | $550 |
$3,760
-
kWh
|
- | |
02 | 2.7261: Install timers and/or thermostats | $2,117 | $1,000 |
$1,383
25,791
kWh
|
$734
-
MMBtu
|
|
03 | 2.6212: Turn off equipment during breaks, reduce operating time | $351 | $50 |
$283
5,275
kWh
|
$68
-
MMBtu
|
|
04 | 2.7262: Separate controls of air handlers from ac/ heating systems | $1,431 | $4,000 |
$1,431
26,671
kWh
|
- | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,030 | $250 | - |
$1,030
-
MMBtu
|
|
06 | 2.2437: Recover waste heat from equipment | $801 | $720 |
$393
7,327
kWh
|
$408
-
MMBtu
|
|
07 | 2.4221: Install compressor air intakes in coolest locations | $157 | $75 |
$157
2,931
kWh
|
- | |
08 | 2.7111: Reduce illumination to minimum necessary levels | $3,018 | $2,148 |
$3,018
56,272
kWh
|
- | |
TOTAL RECOMMENDED | $12,665 | $8,793 |
$10,425
124,267
kWh
|
$2,240
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,689 | $5,850 |
$6,857
57,737
kWh
|
$1,832
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs