ITAC Assessment: MA0762
ITAC logo
ITAC Assessment: MA0762
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Adhesives
NAICS 325520: Adhesive Manufacturing
SIC 2891: Adhesives and Sealants
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 176,000
ft2
Annual Production 5,700
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,376,912 11,503,200
kWh
Electricity Demand $269,209 30,248
kW-mo/yr
Natural Gas $1,022,782 75,601
MMBtu
Waste Disposal Costs
Water Usage $20,755 4,659,616
Tgal
Water Disposal $38,535 6,984
Tgal
TOTAL YEARLY COSTS $2,728,193
RECOMMENDED SAVINGS* $345,511 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $222,271

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
01 2.2531: Re-size charging openings or add movable cover or door $94,561 $209,164 - $94,561
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $65,741 $161,899 $65,741
547,841
kWh
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $52,257 $19,975 $52,257
435,472
kWh
- - -
04 2.2437: Recover waste heat from equipment $49,046 $65,000 - $49,046
-
MMBtu
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $47,587 $19,980 $47,587
396,560
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,640 $13,585 $7,640
63,666
kWh
- - -
07 2.2511: Insulate bare equipment $6,359 $2,631 - $6,359
-
MMBtu
- -
08 2.6218: Turn off equipment when not in use $12,943 $100 $13,081
109,009
kWh
- $(-62.0)
-
Tgal
$(-76.0)
-
Tgal
09 2.4322: Use or replace with energy efficient substitutes $6,192 $4,000 $6,192
51,596
kWh
- - -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,185 $7,200 $3,185
26,542
kWh
- - -
TOTAL RECOMMENDED $345,511 $503,534 $195,683
1,630,686
kWh
$149,966
-
MMBtu
$(-62.0)
-
Tgal
$(-76.0)
-
Tgal
TOTAL IMPLEMENTED $222,271 $280,439 $173,225
1,443,539
kWh
$49,046
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs