| Assessment Year | 1984 |
|---|---|
| Principal Product | WELDING EQUIPMENT |
| NAICS |
n/a
|
| SIC | 3549: Metalworking Machinery, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 180 |
| Plant Area |
n/a
|
| Annual Production | 55
pieces
|
| Production Hrs. Annual | 4,368
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $52,460 | 895,369 |
kWh
|
$0.059 |
| Natural Gas | $23,444 | 5,682 |
MMBtu
|
$4.13 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,847 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,049 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $963 | $908 |
$963
17,585
kWh
|
- | - | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $300 | $300 | - |
$300
-
MMBtu
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $290 | $50 |
$290
5,275
kWh
|
- | - | |
| 04 | 2.7492: Use proper thickness of insulation on building envelope | $694 | $1,127 | - |
$694
-
MMBtu
|
- | |
| 05 | 2.7261: Install timers and/or thermostats | $5,808 | $4,000 | - |
$5,808
-
MMBtu
|
- | |
| 06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $791 | $230 | - |
$791
-
MMBtu
|
- | |
| 07 | 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown | $1,240 | $103 |
$256
4,689
kWh
|
$984
-
MMBtu
|
- | |
| 08 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $293 | $120 |
$293
4,982
kWh
|
- | - | |
| 09 | 2.3512: De-energize excess transformer capacity | $220 | $100 |
$220
4,103
kWh
|
- | - | |
| 10 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,676 | $5,000 |
$3,636
-
kWh
|
- | $(-960.0) | |
| 11 | 2.4235: Remove or close off unneeded compressed air lines | $335 | $250 |
$335
6,155
kWh
|
- | - | |
| 12 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $1,237 | $3,000 | - |
$1,237
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $14,847 | $15,188 |
$5,993
42,789
kWh
|
$9,814
-
MMBtu
|
$(-960.0) | ||
| TOTAL IMPLEMENTED | $6,049 | $7,865 |
$5,224
29,015
kWh
|
$1,785
-
MMBtu
|
$(-960.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs