ITAC Assessment: UA0261
ITAC logo
ITAC Assessment: UA0261
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Steel Sheet
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 85,400
ft2
Annual Production 12,201,411
units
Production Hrs. Annual 6,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $156,646 5,163,200
kWh
Electricity Demand $36,586 5,570
kW-mo/yr
Electricity Fees $36,582 -
Natural Gas $22,718 1,876
MMBtu
TOTAL YEARLY COSTS $252,532
RECOMMENDED SAVINGS* $50,682 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,987

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7261: Install timers and/or thermostats $14,348 $2,201 $12,064
397,637
kWh
- $2,284
02 2.7232: Replace existing hvac unit with high efficiency model $21,987 $82,172 $14,260
470,030
kWh
$4,227
-
kW-mo/yr
$3,500
03 2.4239: Eliminate or reduce compressed air usage $477 $500 $275
9,054
kWh
$126
-
kW-mo/yr
$76
04 2.3212: Optimize plant power factor $10,151 $2,946 - - $10,151
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,719 $7,168 $2,182
71,928
kWh
$945
-
kW-mo/yr
$592
TOTAL RECOMMENDED $50,682 $94,987 $28,781
948,649
kWh
$5,298
-
kW-mo/yr
$16,603
TOTAL IMPLEMENTED $21,987 $82,172 $14,260
470,030
kWh
$4,227
-
kW-mo/yr
$3,500
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs