Assessment Year | 2009 |
---|---|
Principal Product | Mounted Ball Bearings |
NAICS | 332991: Ball and Roller Bearing Manufacturing |
SIC | 3562: Ball and Roller Bearings |
Sales Range | less than $500 k |
# of Employees | 220 |
Plant Area |
200,000
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,383,097 | 19,965,600 |
kWh
|
$0.069 |
Natural Gas | $105,766 | 7,098 |
MMBtu
|
$14.90 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $245,298 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $114,948 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $88,970 | $217,270 |
$47,140
1,012,860
kWh
|
$23,620
-
kW-mo/yr
|
$18,210 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,100 | $32,390 |
$4,700
101,106
kWh
|
$2,360
-
kW-mo/yr
|
$2,040 | |
03 | 2.4322: Use or replace with energy efficient substitutes | $24,648 | - |
$18
407,100
kWh
|
$24,630
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $30,600 | - |
$20,385
438,000
kWh
|
$10,215
-
kW-mo/yr
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,450 | $800 |
$5,630
120,900
kWh
|
$2,820
-
kW-mo/yr
|
- | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $39,750 | - |
$39,750
854,104
kWh
|
- | - | |
07 | 2.7496: Install partitions to reduce size of conditioned space | $32,280 | $40,000 |
$32,280
693,597
kWh
|
- | - | |
08 | 2.7224: Reduce space conditioning during non-working hours | $9,000 | - |
$9,000
193,382
kWh
|
- | - | |
09 | 2.7224: Reduce space conditioning during non-working hours | $2,500 | - |
$2,500
53,717
kWh
|
- | - | |
TOTAL RECOMMENDED | $245,298 | $290,460 |
$161,403
3,874,766
kWh
|
$63,645
-
kW-mo/yr
|
$20,250 | ||
TOTAL IMPLEMENTED | $114,948 | $800 |
$77,283
2,067,203
kWh
|
$37,665
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs