ITAC Assessment: CO0011
ITAC logo
ITAC Assessment: CO0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product HOISTS & CYLINDERS
NAICS
n/a
SIC 3536: Overhead Traveling Cranes, Hoists, and Monorail Systems
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 2,650
pieces
Production Hrs. Annual 2,288
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,877 1,174,971
kWh
Natural Gas $47,955 9,527
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,675 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,387

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,937 $1,434 $1,937
23,740
kWh
-
02 2.6124: Establish equipment maintenance schedule $72 $17 $72
879
kWh
-
03 2.7492: Use proper thickness of insulation on building envelope $1,242 $2,903 - $1,242
-
MMBtu
04 2.7444: Close holes and openings in building such as broken windows $96 $130 - $96
-
MMBtu
05 2.3191: Use demand controller or load shedder $6,445 $10,000 $6,445
-
kWh
-
06 2.6218: Turn off equipment when not in use $550 $800 $550
6,741
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $120 $150 $120
1,465
kWh
-
08 2.7261: Install timers and/or thermostats $9,213 $12 $48
586
kWh
$9,165
-
MMBtu
TOTAL RECOMMENDED $19,675 $15,446 $9,172
33,411
kWh
$10,503
-
MMBtu
TOTAL IMPLEMENTED $19,387 $15,149 $8,980
31,067
kWh
$10,407
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs