ITAC Assessment: BS0076
ITAC logo
ITAC Assessment: BS0076
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Coring Bits and Reamers
NAICS 333131: Mining Machinery and Equipment Manufacturing
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 46
Plant Area 50,000
ft2
Annual Production 40,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,331 1,788,320
kWh
Electricity Demand $128,564 6,988
kW-mo/yr
Electricity Fees $1,185 -
Natural Gas $21,103 3,177
MMBtu
TOTAL YEARLY COSTS $225,183
RECOMMENDED SAVINGS* $23,984 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,358

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $14,626 $14,109 - $14,626 -
02 2.4224: Upgrade controls on compressors $5,025 $2,777 $5,025
120,900
kWh
- -
03 2.6231: Utilize controls to operate equipment only when needed $1,367 $1,665 $1,367
32,899
kWh
- -
04 2.7224: Reduce space conditioning during non-working hours $962 $14 - - $962
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $737 $871 $737
17,732
kWh
- -
06 2.2511: Insulate bare equipment $655 $768 $655
15,753
kWh
- -
07 2.6218: Turn off equipment when not in use $612 $440 $612
14,724
kWh
- -
TOTAL RECOMMENDED $23,984 $20,644 $8,396
202,008
kWh
$14,626 $962
-
MMBtu
TOTAL IMPLEMENTED $9,358 $6,535 $8,396
202,008
kWh
- $962
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings