ITAC Assessment: LL0312
ITAC logo
ITAC Assessment: LL0312
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Oil field tools
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 142
Plant Area 27,285
ft2
Annual Production 360
pieces
Production Hrs. Annual 2,400
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,418 867,000
kWh
Electricity Fees $2,580 -
Natural Gas $21,831 1,322
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,252 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,781

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.2511: Insulate bare equipment $8,673 $10,644 - - $8,673
-
MMBtu
- -
02 2.7111: Reduce illumination to minimum necessary levels $4,439 $1,680 $4,310
43,744
kWh
$129 - - -
03 2.7224: Reduce space conditioning during non-working hours $2,922 $180 $2,837
28,800
kWh
$85 - - -
04 4.611: Begin a practice of predictive / preventative maintenance $1,618 $120 $115
1,170
kWh
$3 - - $1,500
05 2.6211: Conserve energy by efficient use of vending machines $354 $312 $344
3,494
kWh
$10 - - -
06 2.7224: Reduce space conditioning during non-working hours $117 $132 $114
1,152
kWh
$3 - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $129 $70 $66
666
kWh
$2 - $61 -
TOTAL RECOMMENDED $18,252 $13,138 $7,786
79,026
kWh
$232 $8,673
-
MMBtu
$61 $1,500
TOTAL IMPLEMENTED $17,781 $12,694 $7,328
74,380
kWh
$219 $8,673
-
MMBtu
$61 $1,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs