ITAC Assessment: BS0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Mining Equipment
NAICS 333131: Mining Machinery and Equipment Manufacturing
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 120,000
ft2
Annual Production 172
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,260 1,126,093
kWh
Electricity Demand $31,637 6,296
kW-mo/yr
Natural Gas $106,231 15,181
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,250 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.2111: Install steam trap $123 $217 $123
1,890
kWh
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,073 $15 $686
10,558
kWh
$387
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $263 $168 $263
4,052
kWh
- - -
04 2.6218: Turn off equipment when not in use $464 $10 $464
7,139
kWh
- - -
05 2.7243: Improve air circulation with destratification fans / other methods $4,302 $17,525 $(-328.0)
(-5,040)
kWh
- $4,630
-
MMBtu
-
06 2.7492: Use proper thickness of insulation on building envelope $2,800 $2,668 - - $2,800
-
MMBtu
-
07 2.7135: Install occupancy sensors $2,179 $360 $1,502
23,113
kWh
- - $677
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,767 $23,688 $1,240
19,080
kWh
$527
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $33 $160 $33
508
kWh
- - -
10 2.7261: Install timers and/or thermostats $21,246 $1,547 - - $21,246
-
MMBtu
-
TOTAL RECOMMENDED $34,250 $46,358 $3,983
61,300
kWh
$914
-
kW-mo/yr
$28,676
-
MMBtu
$677
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs