Assessment Year | 2014 |
---|---|
Principal Product | Mining Equipment |
NAICS | 333131: Mining Machinery and Equipment Manufacturing |
SIC | 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
120,000
ft2
|
Annual Production | 172
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Idaho |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $73,260 | 1,126,093 |
kWh
|
$0.065 |
Electricity Demand | $31,637 | 6,296 |
kW-mo/yr
|
$5.02 |
Natural Gas | $106,231 | 15,181 |
MMBtu
|
$7.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $34,250 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2111: Install steam trap | $123 | $217 |
$123
1,890
kWh
|
- | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,073 | $15 |
$686
10,558
kWh
|
$387
-
kW-mo/yr
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $263 | $168 |
$263
4,052
kWh
|
- | - | - | |
04 | 2.6218: Turn off equipment when not in use | $464 | $10 |
$464
7,139
kWh
|
- | - | - | |
05 | 2.7243: Improve air circulation with destratification fans / other methods | $4,302 | $17,525 |
$(-328.0)
(-5,040)
kWh
|
- |
$4,630
-
MMBtu
|
- | |
06 | 2.7492: Use proper thickness of insulation on building envelope | $2,800 | $2,668 | - | - |
$2,800
-
MMBtu
|
- | |
07 | 2.7135: Install occupancy sensors | $2,179 | $360 |
$1,502
23,113
kWh
|
- | - | $677 | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,767 | $23,688 |
$1,240
19,080
kWh
|
$527
-
kW-mo/yr
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $33 | $160 |
$33
508
kWh
|
- | - | - | |
10 | 2.7261: Install timers and/or thermostats | $21,246 | $1,547 | - | - |
$21,246
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $34,250 | $46,358 |
$3,983
61,300
kWh
|
$914
-
kW-mo/yr
|
$28,676
-
MMBtu
|
$677 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs