Assessment Year | 2007 |
---|---|
Principal Product | PVC fence, deck, railing, irrigation pipe & fittings |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 133 |
Plant Area |
39,710
ft2
|
Annual Production | 24,600,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $155,796 | 6,010,089 |
kWh
|
$0.026 |
Electricity Demand | $94,389 | 12,949 |
kW-mo/yr
|
$7.29 |
Electricity Fees | $600 | - |
|
- |
Natural Gas | $22,736 | 18,848 |
MMBtu
|
$1.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $10,124 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,910 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $534 | $1,998 |
$354
13,718
kWh
|
$180
-
kW-mo/yr
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,550 | $730 |
$1,120
43,100
kWh
|
$430
-
kW-mo/yr
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $230 | $460 |
$160
6,300
kWh
|
$70
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,790 | $10,600 |
$1,960
76,100
kWh
|
$840
-
kW-mo/yr
|
$130 | $860 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,680 | $11,760 |
$2,140
82,700
kWh
|
$860
-
kW-mo/yr
|
$80 | $600 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $340 | $540 |
$50
1,800
kWh
|
$10
-
kW-mo/yr
|
$60 | $220 | |
TOTAL RECOMMENDED | $10,124 | $26,088 |
$5,784
223,718
kWh
|
$2,390
-
kW-mo/yr
|
$270 | $1,680 | ||
TOTAL IMPLEMENTED | $5,910 | $12,330 |
$3,290
127,300
kWh
|
$1,350
-
kW-mo/yr
|
$190 | $1,080 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs