ITAC Assessment: AT0011
ITAC logo
ITAC Assessment: AT0011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product HOSIERY--SOCKS
NAICS
n/a
SIC 2252: Hosiery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area
n/a
Annual Production 5,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $455,834 10,376,026
kWh
Natural Gas $125,879 24,854
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,335 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,424

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $514 $691 $514
11,723
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,520 - - $1,520
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $1,455 $1,250 $1,455
33,118
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $10,390 $24,300 $10,390
236,518
kWh
-
05 2.2163: Use minimum steam operating pressure $302 - - $302
-
MMBtu
06 2.7261: Install timers and/or thermostats $6,839 $200 - $6,839
-
MMBtu
07 2.6232: Install set-back timers $315 - $315
7,034
kWh
-
TOTAL RECOMMENDED $21,335 $26,441 $12,674
288,393
kWh
$8,661
-
MMBtu
TOTAL IMPLEMENTED $12,424 $24,991 $10,904
248,241
kWh
$1,520
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs