ITAC Assessment: OK0976
ITAC logo
ITAC Assessment: OK0976
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Plastic products
NAICS 326121: Unlaminated Plastics Profile Shape Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 127
Plant Area 220,000
ft2
Annual Production 17,152,684
units
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $370,189 8,689,340
kWh
Electricity Demand $239,481 19,858
kW-mo/yr
Natural Gas $10,607 2,313
MMBtu
Waste Disposal Costs
Water Usage $2,703 210
Tgal
TOTAL YEARLY COSTS $622,980
RECOMMENDED SAVINGS* $91,596 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,636

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2622: Replace existing chiller with high efficiency model $31,812 $180,000 $31,812
739,815
kWh
- -
02 2.7211: Clean and maintain refrigerant condensers and towers $8,586 $3,840 $8,586
199,980
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $13,176 $61,707 $8,559
199,037
kWh
$4,617
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,185 $3,480 $17,185
399,672
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,681 $35,200 $6,681
155,392
kWh
- -
06 3.1191: Change procedures / equipment / operating conditions $12,094 $22,000 $4,858
112,995
kWh
$7,236
-
kW-mo/yr
-
07 2.6232: Install set-back timers $1,177 $240 $178
4,133
kWh
- $1,000
-
MMBtu
08 2.6125: Keep equipment clean $885 $240 - - $885
-
MMBtu
TOTAL RECOMMENDED $91,596 $306,707 $77,859
1,811,024
kWh
$11,853
-
kW-mo/yr
$1,885
-
MMBtu
TOTAL IMPLEMENTED $55,636 $246,027 $49,135
1,142,965
kWh
$4,617
-
kW-mo/yr
$1,885
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs