Assessment Year | 2023 |
---|---|
Principal Product | architectural precast concrete |
NAICS | 327390: Other Concrete Product Manufacturing |
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $1 M to 5M |
# of Employees | 32 |
Plant Area |
52,000
ft2
|
Annual Production | 20,000
pieces
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $33,894 | 461,921 |
kWh
|
$0.073 | |
Electricity Demand | $21,785 | 3,163 |
kW-mo/yr
|
$6.89 | |
Electricity Fees | $27,751 | - |
|
- | |
Natural Gas | $3,931 | 609 |
MMBtu
|
$6.45 | |
LPG | $5,611 | 119 |
MMBtu
|
$47.15 | |
Waste Disposal Costs | |||||
Water Usage | $9,493 | 889 |
Tgal
|
$10.68 | |
TOTAL YEARLY COSTS | $102,465 | ||||
RECOMMENDED SAVINGS* | $17,852 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $12,073 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $11,534 | $44,427 |
$8,475
115,630
kWh
|
$3,059
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,698 | $7,427 |
$3,248
44,303
kWh
|
$1,409
-
kW-mo/yr
|
$41 | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $1,081 | $17,428 |
$677
8,189
kWh
|
$404
-
kW-mo/yr
|
- | |
04 | 2.7444: Close holes and openings in building such as broken windows | $539 | $156 |
$322
4,382
kWh
|
$217
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $17,852 | $69,438 |
$12,722
172,504
kWh
|
$5,089
-
kW-mo/yr
|
$41 | ||
TOTAL IMPLEMENTED | $12,073 | $44,583 |
$8,797
120,012
kWh
|
$3,276
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs