ITAC Assessment: AS0535
ITAC logo
ITAC Assessment: AS0535
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product architectural precast concrete
NAICS 327390: Other Concrete Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $1
M
to 5
M
# of Employees 32
Plant Area 52,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,894 461,921
kWh
Electricity Demand $21,785 3,163
kW-mo/yr
Electricity Fees $27,751 -
Natural Gas $3,931 609
MMBtu
LPG $5,611 119
MMBtu
Waste Disposal Costs
Water Usage $9,493 889
Tgal
TOTAL YEARLY COSTS $102,465
RECOMMENDED SAVINGS* $17,852 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,073

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4226: Use / purchase optimum sized compressor $11,534 $44,427 $8,475
115,630
kWh
$3,059
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,698 $7,427 $3,248
44,303
kWh
$1,409
-
kW-mo/yr
$41
03 2.7232: Replace existing hvac unit with high efficiency model $1,081 $17,428 $677
8,189
kWh
$404
-
kW-mo/yr
-
04 2.7444: Close holes and openings in building such as broken windows $539 $156 $322
4,382
kWh
$217
-
kW-mo/yr
-
TOTAL RECOMMENDED $17,852 $69,438 $12,722
172,504
kWh
$5,089
-
kW-mo/yr
$41
TOTAL IMPLEMENTED $12,073 $44,583 $8,797
120,012
kWh
$3,276
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs